Avaliação pós-ocupação e análise do desempenho térmico em habitação de interesse social com sistema de construção em concreto moldado in loco.
dc.contributor.advisor | Gomes, Adriano Pinto | pt_BR |
dc.contributor.advisor | Ribas, Rovadávia Aline de Jesus | pt_BR |
dc.contributor.author | Santos, Lívia Lane Ferreira dos | |
dc.contributor.referee | Gomes, Adriano Pinto | pt_BR |
dc.contributor.referee | Souza, Henor Artur de | pt_BR |
dc.contributor.referee | Ribas, Rovadávia Aline de Jesus | pt_BR |
dc.contributor.referee | Lage, Carmem Miranda | pt_BR |
dc.date.accessioned | 2021-07-09T14:37:13Z | |
dc.date.available | 2021-07-09T14:37:13Z | |
dc.date.issued | 2021 | pt_BR |
dc.description | Programa de Pós-Graduação em Engenharia das Construções. Departamento de Engenharia Civil, Escola de Minas, Universidade Federal de Ouro Preto. | pt_BR |
dc.description.abstract | Nos últimos anos, a construção civil tem buscado inserir novas técnicas e métodos de construção que aumentem a produtividade, diminuam custos e improvisações e que atendam aos quesitos de desempenho. E, neste contexto, a metodologia de construção em paredes de concreto moldadas in loco vem sendo empregada, principalmente em construções de larga escala, como aquelas de interesse social custeada por programas governamentais, visto que essa técnica implica em uma maior velocidade de construção e racionalização da produção. Diante dessa utilização, neste trabalho realizou-se uma Avaliação Pós-Ocupação (APO) em um conjunto habitacional multipavimentos de interesse social constituídos de paredes de concreto moldadas in loco, localizado na cidade de Ouro Branco, MG. Além disso, fezse uma avaliação do desempenho térmico por meio de simulação computacional. A Avaliação Pós-Ocupação foi realizada por meio da aplicação de um questionário junto aos moradores, e com essa técnica percebeu-se que grande parte das moradias apresentavam problemas, como infiltrações e trincas, em menos de 18 meses de uso. Desse modo, foi obtido acentuados indicadores de insatisfação dos usuários com o sistema de construção. No âmbito do conforto térmico a APO teve números aceitáveis, sendo que no mínimo 70% dos entrevistados consideraram a temperatura no interior da edificação como regular, boa ou ótima na condição de verão e no mínimo 73% tiveram as mesmas considerações na condição de inverno. Os resultados obtidos por meio da simulação computacional no EnergyPlus expuseram que as alternativas de construção adotadas no objeto de estudo atenderam aos critérios da norma de desempenho NBR 15575 no nível mínimo, quando as aberturas são sombreadas. Este resultado está em conformidade com os levantamentos da APO, em que foi baixa a insatisfação dos moradores perante o desempenho térmico da habitação. Em síntese, por meio deste estudo constata-se que para que a construção seja adequada aos usuários, é necessário analisar fatores individuais de cada localidade e atentar-se a concepção. Deve-se considerar a construção em si e particularidades da construção, como dimensões da habitação, escolhas de técnicas de construção, materiais, questões projetuais, que considerem condições climáticas e de incidência solar, demandas culturais da localidade e aspectos da microrregião onde será implantada. Faz–se imprescindível, ainda, um rigoroso controle da produção para diminuição das falhas e inadequações dos edifícios, para assim se obterem melhores habitações. | pt_BR |
dc.description.abstracten | In recent years, civil construction has sought to insert new techniques and construction methods that increase productivity, reduce costs and improvisation, and meet performance requirements. In this context, the methodology of construction with castin-place concrete walls has been used, especially in large-scale buildings, such as those of social interest funded by government programs, since this technique implies a greater speed of construction and production rationalization. In view of this use, this paper carried out a Post-Occupation Evaluation (POA) of a social housing complex consisting of cast-in-place concrete walls, located in the city of Ouro Branco, MG, Brazil. In addition, a thermal performance evaluation was carried out by means of computer simulation. The Post-Occupation Evaluation was carried out by applying a questionnaire to the dwellers, and with this technique it was realized that most of the dwellings presented problems, such as infiltrations and cracks, in less than 18 months of use. Thus, it was obtained strong indicators of dissatisfaction of users with the construction system. In terms of thermal comfort, the APO had acceptable numbers, with at least 70% of the interviewees considering the temperature inside the building as regular, good or excellent in summer conditions, and at least 73% with the same considerations in winter conditions. The results obtained through the computer simulation in EnergyPlus showed that the building alternatives adopted in the object of study met the criteria of the NBR 15575 performance standard at the minimum level, when the openings are shaded. This result is in accordance with the APO surveys, in which residents' dissatisfaction with the thermal performance of the dwelling was low. In summary, this study shows that for the construction to be adequate for the users, it is necessary to analyze individual factors of each location and pay attention to the design. One must consider the construction itself and the particularities of the construction, such as the dimensions of the dwelling, choices of construction techniques, materials, design issues, which consider climatic conditions and solar incidence, cultural demands of the locality and aspects of the micro-region where it will be implemented. It is also essential to have a rigorous production control to reduce flaws and inadequacies of the buildings, in order to obtain better dwellings. | pt_BR |
dc.identifier.citation | SANTOS, Lívia Lane Ferreira dos. Avaliação pós-ocupação e análise do desempenho térmico em habitação de interesse social com sistema de construção em concreto moldado in loco. 2021. 126 f. Dissertação (Mestrado Profissional em Engenharia das Construções) - Escola de Minas, Universidade Federal de Ouro Preto, Ouro Preto, 2021. | pt_BR |
dc.identifier.uri | http://www.repositorio.ufop.br/jspui/handle/123456789/13358 | |
dc.language.iso | pt_BR | pt_BR |
dc.rights | aberto | pt_BR |
dc.rights.license | Autorização concedida ao Repositório Institucional da UFOP pelo(a) autor(a) em 06/06/2021 com as seguintes condições: disponível sob Licença Creative Commons 4.0 que permite copiar, distribuir e transmitir o trabalho, desde que sejam citados o autor e o licenciante. Não permite a adaptação. | pt_BR |
dc.rights.uri | http://creativecommons.org/licenses/by-nd/3.0/us/ | * |
dc.subject | Arquitetura - avaliação pós-ocupação | pt_BR |
dc.subject | Edifícios - desempenho térmico | pt_BR |
dc.subject | Paredes de concreto | pt_BR |
dc.title | Avaliação pós-ocupação e análise do desempenho térmico em habitação de interesse social com sistema de construção em concreto moldado in loco. | pt_BR |
dc.type | Dissertacao | pt_BR |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- DISSERTAÇÂO_AvaliaçãoPósOcupação.pdf
- Size:
- 2.66 MB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: